운영 시간휴관
토요일, 3월 7, 2026
Fondation Louis Vuitton, 8 Avenue du Mahatma Gandhi, 75116 Paris, France
돌아가기: architecture
construction

Fondation Louis Vuitton Construction: A Technical Narrative

A behind-the-scenes view of timber arches, steel joints, and glass sails at the Fondation Louis Vuitton.

1/21/2026
19 min read
FLV wood arches detail

Wood Arches Steel Joint Internal Roof

Overview

Inside the making of the Fondation Louis Vuitton: wood arches, steel joints, glass sails—coordination at architectural and craft scales.


Phasing Table

Phase Scope
Foundations Substructure, services
Timber Arches Fabrication, erection
Steel Ribs Connection + stability
Glass Sails Panelization + install

Note: Digital coordination aligned shop drawings with on-site tolerances.

Field Notes

  • Tolerances refined per interface.
  • Crane lifts sequenced to reduce rework.
  • Test panels validate color livery.

Craft & Computation

  • Cardboard/wood models inform digital rationalization.
  • CATIA coordinates complex joints and ribs.

Checklist

  • Verify tolerances at each interface.
  • Sequence lifts to reduce rework.
  • Align livery with test panels.

저자 소개

Paris Culture Desk

Paris Culture Desk

이 안내서는 여러분의 재단 방문이 여유롭고 호기심 가득하며, 타이밍이 잘 맞도록——그리고 게리 건축의 특별함을 놓치지 않도록——작성되었습니다.

Tags

Fondation Louis Vuitton
Construction
Engineering

Comments (0)

Leave a Comment

Loading comments...