開館時間休館
土曜日, 3月 7, 2026
Fondation Louis Vuitton, 8 Avenue du Mahatma Gandhi, 75116 Paris, France
戻る: architecture
construction

Fondation Louis Vuitton Construction: A Technical Narrative

A behind-the-scenes view of timber arches, steel joints, and glass sails at the Fondation Louis Vuitton.

1/21/2026
19 min read
FLV wood arches detail

Wood Arches Steel Joint Internal Roof

Overview

Inside the making of the Fondation Louis Vuitton: wood arches, steel joints, glass sails—coordination at architectural and craft scales.


Phasing Table

Phase Scope
Foundations Substructure, services
Timber Arches Fabrication, erection
Steel Ribs Connection + stability
Glass Sails Panelization + install

Note: Digital coordination aligned shop drawings with on-site tolerances.

Field Notes

  • Tolerances refined per interface.
  • Crane lifts sequenced to reduce rework.
  • Test panels validate color livery.

Craft & Computation

  • Cardboard/wood models inform digital rationalization.
  • CATIA coordinates complex joints and ribs.

Checklist

  • Verify tolerances at each interface.
  • Sequence lifts to reduce rework.
  • Align livery with test panels.

著者について

Paris Culture Desk

Paris Culture Desk

このガイドは、フォンダシオンでの時間が穏やかで好奇心に満ち、程よいテンポになるように——そして、ゲーリー建築の特別さを見逃さないように——作成しました。

Tags

Fondation Louis Vuitton
Construction
Engineering

Comments (0)

Leave a Comment

Loading comments...