BesøgstiderLukket
Lørdag, Marts 7, 2026
Fondation Louis Vuitton, 8 Avenue du Mahatma Gandhi, 75116 Paris, Frankrig
Tilbage til practice
construction

Fondation Louis Vuitton: Construction Timeline and Phasing

A timeline of the Fondation Louis Vuitton’s construction—phasing, lifts, and testing for timber, steel, and glass.

12/28/2025
12 min read
FLV construction aerial view

Construction Aerial

Overview

From groundworks to glass sails—how schedules, lifts, and testing choreographed a complex build in the Jardin d’Acclimatation.


Timeline Table

Stage Notes
Groundworks Services, foundations, site logistics
Structure Timber arches + steel ribs erection
Envelope Glass sails testing + installation
Commissioning Systems tuning, livery tests

Site Logistics

  • Crane positioning within wooded context.
  • Delivery sequencing to avoid park disruption.

Testing & Tolerances

  • Mockups validate glass curvature + fixings.
  • Tolerance checks at wood/steel interfaces.

Tip: Track field RFIs to see design responding to site realities.

Checklist

  • Confirm lift sequencing
  • Validate envelope mockups
  • Commission lighting + color livery

Om forfatteren

Practice Notes

Practice Notes

Jeg skrev denne guide for at gøre dit besøg på Fondation Louis Vuitton roligt, nysgerrigt og velafstemt — uden at misse det, der gør Gehrys bygning særlig.

Tags

Construction
Timeline
FLV

Comments (0)

Leave a Comment

Loading comments...